April 16, 2009

Notification of Capital Improvement Plan Construction- Kirby 4A

In order to keep pace with the growing needs of the community, the City of Houston, through the Department of Public Works and Engineering, will be improving the storm sewers in the area described below. The contractor for this project is BRH Garver Construction, L.P. and work will start on April 28, 2009 and is scheduled to end on August 21, 2010.  You may not see any activity by the contractor for several weeks after the construction time has begun. This is due to the contractor getting prepared to perform work which includes procurement of materials and equipment, setting up staging areas or working in other areas in the project

A detailed description and contact information is listed below.

WBS No. M-000771-0004-4

Project Description:

The project consists of the design of a single 14-foot X 12-foot reinforced concrete box storm sewer from 100 feet south of Robinhood to Quenby. From Quenby, a single 10-foot by 10-foot reinforced concrete box storm sewer will proceed north along Kirby and connect to an existing 11-foot by 7.5-foot reinforced concrete box storm sewer at Albans Ave. The storm sewer tie-in consists of a single 10-foot by 10-foot reinforced concrete box storm sewer which travels east along Quenby to Morningside Dr. where it transitions to a 10-foot by 6.5-foot reinforced concrete box storm sewer and continues on to the connection at Greenbriar. The storm sewer improvements will also include associated inlets, inlet leads, and laterals. The roadway pavement will be designed for reconstruction as full width concrete with curb and gutter. The pavement from 100-ft. south of Robinhood to Bissonnet will be a four-lane undivided section with continuous left-turn lane.

Construction Cost: $6,658,042.37

Streets involved in construction: 

Street Name
From 
To

Kirby Ave.

Tangley at the intersection on the East side.

Tangley at the intersection on the East side.

Kirby Ave.

Robinhood at the intersection on the West. side

Robinhood at the intersection on the East.

Kirby Ave

Quenby Dr. (On East side)

Kelvin St.

Kirby Ave.

Nottingham at the intersection on the East side

Nottingham at the intersection on the West. side

Kirby Ave.

Sunset at the intersection on the East side

Sunset at the intersection on the West. side

Kirby Ave.

Albans Ave. at the intersection on the East side

Albans Ave. at the intersection on the West side

Kirby Ave.

Wroxton Ave. at the intersection on the East side

Wroxton Ave. at the intersection on the West side

Quenby Dr.

Kelvin St

Morningside St.

Morningside St.

Quenby Dr. on East side

Quenby Dr. on West side.

Construction Firm:BRH Garver Construction, L.P.

Construction Firm Project Manager: Kurt Rodell 281-770-3614 kurtroedel@brhgarver.com

City of Houston Project Manager: Jody Craze 713-837-7188 jody.craze@cityofhouston.net

City of Houston Managing Engineer:  JoAnne Kamman 713-837-7208 joanne.kamman@cityofhouston.net

The contractor is required to provide residents written notification, via door hangers, 72 hours prior to construction beginning on your street. Periodic updates of the construction schedule will be sent out using CitizensNet.

If you have questions about the construction phase please contact the City of Houston Project Manager listed above. If the issue is not resolved to your satisfaction please contact the City of Houston Managing Engineer listed above or Tim Lincoln, Senior Assistant Director, Construction Branch at (713) 837-7074 or e-mail at tim.lincoln@cityofhouston.net.