Notification of Capital Improvement Program Construction Plan in Shepherd Park Plaza Area

In order to keep pace with the growing needs of the community, the City of Houston through the Department of Public Works and Engineering will be improving the water lines in the area described below. The contractor for this project is Collins Construction, LLC and work will start on 08/11/2008 and is scheduled to end on 04/08/2009 . You may not see any activity by the contractor for several weeks after the construction time has begun. This is due to the contractor getting prepared to perform work which includes procurement of materials and equipment, setting up staging areas or working in other areas in the project.

A detailed description and contact information is listed below.

This project consists of approximately 25,911 linear feet of 8-inch diameter water lines, valves, and appurtenances.

WBS No.: S-000035-00N6-4

Project Description: Water Line Replacement in Shepherd Park Plaza Area

Construction Cost: $1,556,029.60

Streets involved in construction:

Street Name To From

Thornton

Ella

Brian Haven

Chamboard

Apollo

Brinkman

Brian Haven

Thornton

Chantilly

Chantilly

Apollo

Golf

Curtin

Apollo

Golf

Golf Drive

Chamboard

Chantilly

Curtin

Golf

Brinkman

Thornton Circle

Thornton Street

Cul-de-Sac

Clifthaven

Thornton

Chantilly

Chantilly

Clifthaven

Alba

Alba

Thornton

Chantilly

Alba

Chamboard

Thornton

Chantilly Street

Chantilly Circle

Cul-de-Sac

Chantilly Street

Dunsmer Circle

Cul-de-Sac

Thornton

Dunsmer

N. Shepherd

Dunsmer

Thornton

Chamboard

Brinkman

Chamboard

Woodcrest

Curtin

Brinkman

N. Shepherd

Woodcrest

Brinkman

Martin

Construction Firm: Collins Construction, LLC

Construction Firm Project Manager: Ricky Collins (281-313-1774)

Construction Management and Inspection (CM&I) Firm: LJA Engineering & Surveying

CM&I Project Manager: Larry Brown (713-451-0214)

CM&I Project Inspector: Kevin Johnston (832-250-2386)

City of Houston Project Manager: Nevzat Gokmen, P.E. (713-837-0609)

nevzat.gokmen@cityofhouston.net

City of Houston Managing Engineer: Aldo Ranzani, P.E. (713-837-7047)

aldo.ranzani@cityofhouston.net

The contractor is required to provide residents written notification, via door hangers, 72 hours prior to construction beginning on your street. Periodic updates of the construction schedule will be sent out using CitizensNet.

If you have questions about the construction phase please contact the Construction Management and Inspection Project Manager or the City of Houston Project Manager listed above.If the issue is not resolved to your satisfaction please contact the City of Houston Managing Engineer listed above or Tim Lincoln, Senior Assistant Director, Construction Branch at (713) 837-7074 or e-mail at tim.lincoln@cityofhouston.net.