Notification of Capital Improvement Plan Construction Project in Shepherd Park Terrace area

In order to keep pace with the growing needs of the community, the City of Houston through the Department of Public Works and Engineering will be improving the water lines in the area described below. The contractor for this project is R. K. Wheaton, Inc. and work will start on 09/08/2008 and is scheduled to end on 09/23/2009. You may not see any activity by the contractor for several weeks after the construction time has begun. This is due to the contractor getting prepared to perform work which includes procurement of materials and equipment, setting up staging areas or working in other areas in the project

A detailed description and contact information is listed below.

This project consists of approximately 48,293 linear feet of 8-inch diameter water lines, valves, and appurtenances.

WBS No.: S-000035-00N5-4

Project Description: Water Line Replacement in Shepherd Park Terrace Area

Construction Cost: $2,879,884.50

Streets involved in construction:

Street Name
TO
FROM

Bethlehem

Apollo

Candlelight

Candleglow

Bethlehem

Cul-de-sac

Cliffhaven

Bethlehem

Cul-de-sac

Park Plaza

Bethlehem

Cul-de-sac

Park Plaza

Candlelight

Chantilly

Alba

Lehman

Candlelight

Alba

Pinemont

Lehman

Del Norte

Alba

Cul-de-Sac

Lehman

Ella

Park Plaza

Lehman

Cul-de-Sac

Easement

Lehman

Easement

N. Shepherd

Candlelight Lane

Apollo

Cul-de-Sac

Candlelight Lane

Cul-de-Sac

Brinkman

Martin

Ella

Cul-de-Sac

Martin

Brian Haven

Dunsmere

Martin

Brinkman

N. Shepherd

Richelieu Lane

Apollo

Cul-de-Sac

Richelieu Lane

Cul-de-Sac

Dunsmere

Del Norte

Candletree

Park Plaza

Janisch

Brinkman

N. Shepherd

Oak

Brinkman

N. Shepherd

Brian Haven

Bethlehem

Chantilly

Dunsmere

Candlelight

Chantilly

Dunsmere

Bethlehem

Candlelight

Candlemist

Lehman

Dead End

Candletree

Cul-de-Sac

Bethlehem

Candletree

Lehman

Del Norte

Twin Candle

Cul-de-Sac

Bethlehem

Twin Candle

Lehman

Cul-de-Sac

Apollo

Cheshire

Lehman

Cheshire

Apollo

Cul-de-Sac

Cheshire

Cul-de-Sac

Dunsmere

Golf

Cul-de-Sac

Pinemont

Candlecrest

Cul-de-Sac

Bethlehem

Park Plaza

Bethlehem

Del Norte

Candleleaf

Cul-de-Sac

Bethlehem

Candlemist

Cul-de-Sac

Bethlehem

Brinkman

Woodcrest

Pinemont

Construction Firm: R.K. Wheaton, Inc.

Construction Firm Project Manager: Scott Ellefson, P.E. (281-391-4410)

City of Houston Inspector: Harold McKinley (713-412-3504)

City of Houston Senior Inspector: Julius Lovelady (713-854-2775)

City of Houston Project Manager: Nevzat Gokmen, P.E. (713-837-0609)

Nevzat.Gokmen@cityofhouston.net

City of Houston Managing Engineer: Aldo Ranzani, P.E. (713-837-7047)

Aldo.Ranzani@cityofhouston.net

The contractor is required to provide residents written notification, via door hangers, 72 hours prior to construction beginning on your street. Periodic updates of the construction schedule will be sent out using CitizensNet.

If you have questions about the construction phase please contact the Construction Management and Inspection Project Manager or the City of Houston Project Manager listed above.If the issue is not resolved to your satisfaction please contact the City of Houston Managing Engineer listed above or Tim Lincoln, Senior Assistant Director, Construction Branch at (713) 837-7074 or e-mail at tim.lincoln@cityofhouston.net .