www.houstontx.gov > Construction Projects> 36-Inch Waterline Along Eldridge

36" WATER LINE ALONG ELDRIDGE

ZIP 77077
STREETS Eldridge, between Sandbridge and Westheimer
CIP S-0900-AC-3
BEGIN 7.30.07
END 240 days
COST $4,196,474.00
CONTRACTOR BRH-Garver Construction
DESCRIPTION This project provides for the design and construction of major water distribution lines to convey treated water from surface water facilities.

Eldridge Graphic