The Capital Improvement Plan is vital to our City. It is a five-year plan for physical improvements to public facilities and infrastructure through which tax dollars for streets and traffic control, libraries, storm drainage, police, housing, fire, solid waste, public health, and parks are allocated. The CIP plan is revised annually to include new projects and to reflect change in priorities. In addition, public meetings are held every year, in each City Council District, to provide citizens an opportunity to comment on the process and recommend projects to be included in the plan.
The Adopted fiscal year (FY) 2007-2011 CIP calls for the appropriation of $4.51 billion during the five-year period for two major categories of programs, enterprise and property tax supported programs. Of the total planned appropriations, $2.25 billion is for projects in the enterprise fund programs (Airport, Convention & Entertainment, Wastewater, and Water). The remaining $2.27 billion addresses a full range of citywide capital facility and infrastructure improvements.
The Parks and Recreation Department's FY 2007-2011 CIP budget total $155 million and is funded by several funding sources including bond funds, grants, and other agencies and or private contributions. This five-year CIP program continues Phase I of the Master Plan. The current Parks Master Plan will be updated in FY2007. The following is a list of 2006 Park projects by Council District that have been completed or under construction.
Included a walking/ jogging trail, newly sodded in-field, and site and drainage improvements.
Mangum Manor Park - 5235 Saxon, 77092
Budget
$287,000
Completion Date
2007
Project Scope
Included the installation of a retaining wall; new playground equipment and the removal and replacement of the existing swing set; asphalt walking / jogging trail; grading and drainage, landscaping and irrigation; security lights; plaza and picnic shelter improvements, and a new concrete sidewalk.
Freed Park - 7020 Shadyvilla Ln., 77055
Budget
$348,000
Completion Date
2007
Project Scope
Included moving the electrical service from street to park, new handicapped parking, new playground, benches, water fountain, walkway and site and drainage improvements.
Sylvester Turner Park - 2800 W. Little York, 77091
Budget
$2,521,000
Completion Date
2007
Project Scope
Includes the redevelopment of the park with two lighted little league field, one lighted NCAA field, jogging trails, walks, boardwalk, signage, fencing, irrigation, site lighting, parking lots, playground, picnic shelter, landscape and drainage improvements.
Haden Park - 1404 Witte Rd., 77080
Budget
$512,000
Completion Date
2007
Project Scope
Project Scope: Includes a new playground, new parking lot, asphalt walking/jogging trail, security lighting, drinking fountain, benches, gazebo, entry walls, signage, landscaping, irrigation, grading and drainage.
Freshmeadow Park - 4500 Campbell Rd., 77041
Budget
$100,000
Completion Date
2007
Project Scope
Includes a new asphalt walking/jogging trail, grading and ADA connector sidewalks.
Agnes Moffit - 10645 Hammerly, 77043
Budget
$25,000
Completion Date
2007
Project Scope
Included installation of a masonry entry sign wall.
District C
Reeves (Gail) Park - 8800 Mullins, 77096
Budget
TBA
Completion Date
2007
Project Scope
Includes a new sidewalks, walking/jogging trail, playground equipment, seating plaza, ornamental fencing, basketball court and security lighting; renovation of the picnic pavilion; improvements to grading and drainage and the tennis court.
Included pavilion renovations, new picnic shelter, new playground, entry plaza development, walking/jogging trail improvements, drainage improvements, landscape and irrigation, picnic tables, benches, drinking fountain, new roof on the community center and pool building, interior and exterior painting, new storefront and doors and new flooring.
Project scope included community center renovation and expansion, pavilion renovation, new exercise area, site lighting, new entry plaza and arbor, ramp to the playground, landscape and irrigation, picnic tables, benches and drinking fountain.
MacGregor Park - 5225 Calhoun, 77021
Budget
$1,372,000
Completion Date
2007
Project Scope
Included improvement to the roadway with expansion for parking, new walkways, site lighting, ADA improvements, playground expansion, three picnic shelters with tables, drinking fountain, courtyard development with shade structure and ornamental fencing and electrical service upgrade.
Townwood Park - 3402 Simsbrook, 77045
Budget
$3,240,000
Start Date
2008
Completion Date
Project Scope
Construction is scheduled to begin in 2008. Project Scope: Includes a new community center with gymnasium, parking lot, site lighting, walking/jogging trails and trail relocation, relocation of the pool pumphouse and minor pool upgrades.
Hermann Park Greenway - 6001 Fannin, 77030
Budget
$1,000,000
Start Date
2007
Completion Date
Project Scope
Included a new playground, new parking lot, asphalt walking/jogging trail, security lighting, drinking fountain, benches, gazebo, entry walls, signage, landscaping, irrigation, grading and drainage.
Hermann Park Electrical Upgrades - 6001 Fannin, 77030
Budget
$559,000
Completion Date
2007
Project Scope
Includes improvements to the electrical service building, replacement of the electrical switchgear, and abatement of the floor in the clubhouse.
Hermann Park Trail Improvements - 6001 Fannin, 77030
Budget
$274,000
Start Date
2009
Completion Date
Project Scope
Project is currently in design.
District E
Blackhawk Park - 9401 Fuqua, 77075
Budget
$1,503,000
Completion Date
Currently under contruction.
Project Scope
The scope of work consists of a new entry, paved parking for 60 cars with overflow for 30, two soccer fields, football field, multi-use pavilion with restrooms and concessions, playground, tree plantings with irrigation and picnic area.
Project scope included demolition of the existing pool, pool building, pool decking, and pool fence; and construction of a new pool building, pool, shade canopy, concrete deck, and ornamental steel pool fence. Installed a pool alarm, renovated the basketball pavilion and parking lot, landscape, hardscape, and drainage.
Kingwood Park - 2700 Bens Branch, 77339
Budget
$1,694,000
Completion Date
Project Scope
Project is on hold pending negotiations with Harris County.
Includes new multi-purpose pavillion and site lighting.
Sagemont Park Pool - 11507 Hughes, 77089
Budget
$1,110,000
Completion Date
2007
Project Scope
Included demolition of the pool, pool building, pool decking, and pool fence; and construction of a new pool building, pool, shade canopy, concrete deck, and ornamental steel pool fence; installed a pool alarm, parking lot, landscape, hardscape, and drainage; and improved site lighting.
Sylvan Rodriguez Park - 1201 Clear Lake Blvd., 77062
Budget
$465,000
Completion Date
2006
Project Scope
Consisted of clearing and grading brush vegetation for informal paths throughout the park; adding a new concrete looping jogging trail through the eastern section of the park; creating two Lacrosse fields from existing soccer fields; and making improvements to drainage and landscaping.