December 30, 2008

Notification of Capital Improvement Plan Roseneath Drive Storm Sewer Replacement

In order to keep pace with the growing needs of the community, the City of Houston through the Department of Public Works and Engineering will be improving the storm sewer trunk, storm sewer leads, manholes, inlets, an outfall, and associated pavement repair in the area described below. The contractor for this project is Triple B Services, L.L.P., and work will start on January 2, 2009 and is scheduled to end on April 2, 2009.  You may not see any activity by the contractor for several weeks after the construction time has begun. This is due to the contractor getting prepared to perform work which includes procurement of materials and equipment, setting up staging areas or working in other areas in the project.

A detailed description and contact information is listed below.

  • WBS No. M-000126-0059-4
  • Project Description: Roseneath Drive Storm Sewer Replacement
  • Construction Cost: $507,627.80

Streets involved in construction:

Street Name                            From                                                   To

Roseneath Street                   450 ft E. of Oakcrest Dr                       Oakcrest Dr.

Oakcrest Dr.                           Roseneath Dr.                                      South McGregor Way

HCFCD                                  195' N of curb of S. MacGregor Way       Brays Bayou

  • Construction Firm: Triple B Services, L.L.P.
  • Construction Firm Project Manager: John Betencourt           281-324-3264
  • City of Houston Senior Inspector: Ben Barajas          713-847-1109
  • City of Houston Inspector: Tony Iwu   713-847-1108
  • City of Houston Project Manager: Stavros Koukatsikas         713-837-0921 
  • City of Houston Managing Engineer: Joe Smith         713-837-0946 

The contractor is required to provide residents written notification, via door hangers, 72 hours prior to construction beginning on your street. Periodic updates of the construction schedule will be sent out using CitizensNet.

If you have questions about the construction phase please contact the City of Houston Sr. Inspector or Project Manager listed above. If the issue is not resolved to your satisfaction please contact the City of Houston Managing Engineer listed above or Tim Lincoln, Senior Assistant Director, Construction Branch at (713) 837-7074 or e-mail at tim.lincoln@cityofhouston.net.