  • Hermann Brown Sprayground Restroom – August 18, 2022 – Until Further Notice
    The Herman Brown Park Sprayground Restroom will be closed beginning August 18, 2022 until further notice for repairs to the Lift Station.
  • Margret Jenkins Park - Playground Equipment - October 18, 2022 – Until Further Notice.
    Due to safety concerns, Margret Jenkins Playground Equipment will be removed on October 18, 2022.
  • Mecom Fountain - March 20, 2023 – Until Further Notice
    Due to Pump/Motor repairs the Fountain will be closed beginning March 20, 2023, until further notice.
  • Park at Palm Center - July 2023 – April 2024
    The park will be close for park renovations that include landscaping and irrigation renovation, shade fabric replacement on existing shade canopy frame, splashpad repainting, entry signs and art enhancements, and a new restroom facility and associated utilities. The project is being managed by the OST/Almeda Corridors Redevelopment Authority.
  • Sunnyside Park Small Pool - July 19, 2022 - Until Further Notice
    The Sunnyside Park Small Pool will be closed beginning July 19, 2022, for plaster repairs.
  • University Village Park – April 2023 - December 2023
    University Village Park will be closed for construction starting in April. The scope of the project includes a new play area with flower shade structure, swing, interactive play panels, hopscotch court, four square court; concrete seat wall and picnic table, lawn play area; fencing; perimeter sidewalks; native trees and associated drainage and detention.
  • Windsor Village Community Center – August 21 – November 2023
    Construction at the Windsor Village Community Center will begin the week of August 21st. The scope of work includes full roof replacement and limited repairs and repainting to sections of the roof soffit and fascia. Construction is anticipated to last for three months with a substantial completion date in mid- November. During this time, the building will be closed to the staff and to constituents.
  • Winzer Park – Park Redevelopment – March 2023 - Autumn 2023
    A portion of Winzer Park will be closed for construction of park redevelopment beginning on March 20th. The scope of work for this project includes demolishing the existing play structures, fall surface, and sidewalks and constructing a new playground area including playground equipment, border, fall surface, water playground, pavilion, shade sails, adult workout station, sidewalk, fence, drinking fountain, picnic tables, benches, trash receptacles, grading and storm drainage, ballfield refurbishments, trees and irrigation. The existing parking lot, basketball pavilion, and tennis courts will remain open during construction.